The load is assumed to be initially at rest at the vertical position at the loading point above the ship and equally at rest at the unloading point above the hopper.
Assume-se que a carga esteja inicialmente em repouso na posição vertical no ponto de carga acima do navio e igualmente em repouso no ponto de descarga na moega de alimentação no porto.
...ture contents. Based on the obtained data the diameter of the upper and lower sieve openings were fixed to 20 mm and 6 mm, respectively. The angle of the hopper base and the hopper capacity was fixed to 60 o and 0,17 m 3 , respectively. The maximum air flow rate produced by the ventilation system was fixed to 0,9 m 3 /s. At the second stage, the design and construction of the machine for coffee pre-cle...
...ferentes teores de umidade. Com base nesses dados, foram definidos o diâmetro dos furos da peneira superior de 20 mm e o diâmetro dos furos da peneira inferior de 6 mm; o ângulo de inclinação da moega de 60 o e a capacidade da moega de 0,17 m 3 ; e a vazão máxima de ar produzida pelo sistema de ventilação de 0,9 m 3 /s. Na segunda etapa do trabalho foram desenvolvidos o projeto e a construção da máquina para pré-limpeza de café, empregando técnicas de CAD (Projeto Auxiliado por Computa...